Description

The need for an engineered structural steel mock-up for the Metro Project became a necessity in order to study proposed construction details, test for performance, and possibly judge appearance of the system. It also to enhances facilities and programs  to provide training on a variety of fall arrest systems, perimeter safety, and cable systems that can be used during the steel erection process.