Redlline South Underground is the first project FME ventured under the Qatar Rail Metro Project. 1,480.00 metric tons of steel were fabricated and erected at site for the Overhead Cranes that run along the entire stations of Redline South. The erected structures is utilized to convey and haul excavated materials on ground. The methodology is able to bring all the expertise in the areas of geo-technology and operational methods, aiming at safety and the possible selection of technical options.